22TCN 334-06 PDF

Saturday, August 05, AM 22 TCN 06 Pheu rot Monday, September 21, AM 22TCN Thi cong va. higher than the requirements in standard 22TCN 06 (22TCN, ). – Water absorption of both RAs is higher than that of the natural. 28 Tháng Mười Hai 22 TCN – 06Documents · 22 tcn Documents · PL 03 plan CVC 22 02 pdfDocuments · 22 71 02 Facility Natural-Gas Piping.

Author: Tojakree Zulurr
Country: Dominican Republic
Language: English (Spanish)
Genre: Life
Published (Last): 27 February 2015
Pages: 111
PDF File Size: 19.83 Mb
ePub File Size: 9.53 Mb
ISBN: 680-1-39942-977-9
Downloads: 44016
Price: Free* [*Free Regsitration Required]
Uploader: Zululmaran

We anticipate that settlement of the seabed foundation will be immediately occurred and finished during the construction period of the breakwater.

Fences Land area of 4. Total period of the Services was planned to be six 6 months. The other three alternatives have too much impact on the beach stability. Various Lab Test On Aggregates Final report Task 7: Planning of the Cement-related Area will be discussed in detail in Chapter 5. If the sedimentation in the channel would increase, an additional investment, such as construction of submerged walls to protect the channel, might become necessary to be taken account.

The two ship loaders can 22tfn a larger coverage area than a single unit, 334-006 can double the loading rate. In this Study, the frequency distribution of wave height is available at the location of a water depth of 13m. Depth from the bottom of ship to the upper edge of hatch In the said case, it is necessary to prepare a temporary access way to the site, especially at the beginning of the construction period.

Dong Lam Cement Specialized Port – Basic Design Report – Final – [PDF Document]

A numerical test method of California bearing ratio on graded. Stackers can be made to work for small volumes, in 22tvn emergency where no other equipment is available, or for a trial basis. From the main pipe to buildings, fire-fighting pillars and water supply outlet for ships; branch pipes will be installed as galvanized steel pipe of D50xt3,6 mm and Dx4,5 mm. In order to secure good quality of completion of the facilities and safe construction works, the contractor should prepare proper and adequate Project Quality and Safety Plan before commencement of the construction.

Related Articles  INTRODUCTORY METHODS OF NUMERICAL ANALYSIS BY S.S.SASTRY PDF

The following specific standards will be used for the design of major electrical equipment: The water demand can also be estimated more accurately from the number of people working at the port and other requirements as given below.

22 TCN 02-71-PL

Join the activities on me. This method is rather common in many cement ports. The lighting structure for the monopole will be motorized for ease of maintenance.

It is noted that the dredged sand had better be transferred to 222tcn downstream part, i. Draft at the time of full load 8.

At the end of the pipe, there is water measuring well before connecting to the tank. You did not use the site, Click here to remain logged. The structure of the jetty is compared between 1 Platform-type and 2 Dolphin-type.

It is to be noted that the period depends heavily on the weather and sea conditions, and possible stock of construction materials.

Bearing Ratio CBR test and other tests were used to characterize the. It was concluded that the CBR test may not be For Capesize ships, a single unit will not be able to provide full coverage. Distance from surface of berth to HWL 3. One of the local contractors has fortunately experiences to 334-006 constructed a caisson type breakwater successfully at Tien Sa in 334-60 Port under the technical guidance by a Japanese contractor.

Related Articles  KYUSHO WAZA PDF

To save energy, the following design criteria are applied to the lighting system; For external lighting, high pressure sodium vapor lamp HPSV will be used: The main port entrance is defined to be from the south.

Clinker 22tvn the Plant shall be stored in the clinker silo s. You need is member of groups must can comment this post. JPCBasic Design ReportFebruary Dong Lam Cement Specialized Port ProjectJapan Port Consultants, Ltd 3 Temporary Construction Base and Yard At least, an area of 3ha is required for the temporary construction base and yard to accommodate an office, a parking space for cars and construction equipment, a construction material stock yard, a concrete mixing plant and a yard for manufacturing concrete blocks.

Handing over the equipment shall be done after confirmation of smooth operation of clinker export and coal import8. This pavement structure is designed for the operation of Excavator has two axles and operation weight is 22, kg, transports coal and clinker from storage yards to receiving hoppers.

Wear a smile and have friends; wear a scowl and have 33-06. Two tug boats of 1, HP is planned to be purchased.

In the case of Dong Lam Cement Specialized Port, the major coastal process can be discussed in terms of change in coastline, i. Engine capacity 45 KW. This document was uploaded by me.

Author: admin